Skip to main content

Blogs · Design

What restaurant interior design costs in the GTA and how a brand carries into the room

· Updated

The cost of a restaurant interior is set by four things: the state of the space you take over, its size, how much is custom-made, and how many professionals have to draw it. The design fee is the small part. Construction, mechanical work, kitchen equipment and furniture are the large parts, and the design decides what each of them has to deliver.

The brand is what keeps those decisions consistent. When the idea of the place is settled first, the colours, materials, lighting and furniture have something to follow, and fewer things are chosen twice.

What moves the cost

The space comes first. A unit that was a restaurant last year, with its kitchen and washrooms in place, costs far less to finish than an empty shell. Ask the landlord what is being left behind and in what condition before you sign.

Size and seat count come next, then the level of finish. Stock chairs and standard lighting cost less than a custom banquette, a built bar or a feature made for the room. Every custom piece adds drawings, samples and lead time.

The last driver is change. A layout altered after the contractor has started is the most expensive line in most fit-outs, and it is avoidable.

What interior direction covers

Our interior work covers the concept for the venue, space planning and drawings designed for flow, mood boards, materials, decor and furniture, and the signage, murals and feature walls. It answers how the room should look and feel, where guests queue, sit and order, and what each surface is made of.

It does not replace the people who make a build legal and safe. Permit drawings, engineering and construction belong to licensed professionals and your contractor. They will tell you what the building and the municipality require of your space, and those requirements shape the layout. Bring them in at the start, so the concept is drawn around the constraints.

Who else you will pay

A full fit-out usually involves a designer for the concept and finishes, an architect or other qualified designer for the permit drawings, engineers for the mechanical and electrical work, a kitchen equipment supplier, a general contractor, a millworker for anything built in, and a sign maker.

Get the design fee and the construction estimate as separate figures. A single number that blends them hides which part is high.

How a brand carries into the room

Tuci in Brampton is a grilled-chicken counter by day and a cocktail bar by night, so the room had to do two jobs. The brand's palette became the room's materials: cobalt chairs around steel tables, a red leather banquette, silver used as a texture. A live grill glows beneath a Tuci canopy that turns from daytime blue to evening red, and the lunch tables give way to a bar.

At Sukoon Ghar, a matcha and coffee café in Brampton built around a moment of calm, we shaped the interior with the founder after a research trip through Montreal's cafés. The room has rattan flower-back chairs, white tables, a lemon tree and a glowing cream wall. It reads as the same place as the cup.

It also works the other way. At Musafir in Regina the owners had a dining room of brass lanterns and navy velvet, and wanted a brand to match the build. The identity that followed is a butterfly mark on deep navy and gold, and it sits naturally in that room.

Where to spend and where to hold back

Spend on what guests touch and photograph: the seat, the table, the lighting over it, and one feature that belongs to your brand alone. Spend on the entrance and the counter, where the first impression is made.

Hold back on finishes nobody sees up close and on custom versions of things that exist as stock. A strong idea with three good materials costs less than a vague one with ten.

What to settle before design starts

Have the brand idea, the menu and the service style decided, with a seat count you need the room to reach. Have the lease terms on what the landlord provides and what you may alter. Have a total budget with a contingency, and say it out loud to the designer. A design drawn to a known budget is cheaper than one cut down to it afterwards.

Common questions

Can one team design the brand and the interior?

Yes. Spaces and interiors are part of our design work, so the room, the menu and the packaging all follow one idea. Architects, engineers and contractors still do the permit drawings and the build.

Should the interior be designed before or after the logo?

After the idea, and alongside the logo. The colours and materials of the room and the identity should be chosen together, because the sign, the menu and the wall behind the counter are seen in the same glance.

How do I compare two interior design quotes?

Compare what each one draws and specifies: concept only, or full drawings, a furniture schedule and site visits during the build. Then check whether permit drawings and engineering are included or expected from someone else.

The work behind this article

Talk to us about your restaurant

Book a call